Вход для пользователей

Sign Up!

Русский Українська English

More...

Several functions, that can be used by an AutoCAD® users in their everyday work, now available at Autodesk App Store

AUTODESK App Store


YouTube channel, that demonstrates a basic SAMARA features was created
YouTube channel

AutoCAD 2018 compatible

   Planning plugin (open-cast)

   Planning plugin (open-cast) - plugin for output planning.
   The main purpose - operational open-cast output planning, planning an excavator work schedule.

Plugin was created for operational open-cast output planning. It has simple integration into the SAMARA system, and if it's necessary, we can use FataMorgana module's data (surface and horizon field models) and/or block modeling plugin data (block models). But, in the absence of these data module performance and its functionality will not change.
If we have surface model (AutoCAD compatible, FataMorgana horizon fields, or on paper – for example, sections), mineral resources data (3D AutoCAD objects, FataMorgana horizon fields, block models, or the same sections on paper) we can create a 3D project of the required allotted work in a semiautomatic or manual mode, depending on the data availability. After project construction, we can calculate volume of the excavation blocks, calculate volume of the output mineral resources (parceling to the content of minerals in the block for the block models), parceling an excavation for parts, which are equal in volume (for example, excavator daily productivity), plan the project output (parceling the mineral resource common volume and excavation blocks volume to parts, respective weekly, monthly or other productivities), create a planned improvement sequence quarry and watch stocks at discharge place for a certain time period.

   The main performed operations:
° draw project in planned projection and in 3D model
° calculate volume of the excavation blocks, minerals in the excavation block
° parceling an excavation for parts, which are equal in volume and content of mineral
° isolines construction using the assay data
° create a planned improvement sequence quarry and create the excavator work schedule
° stocks monitoring at discharge place